System Form Truss-Rail Ventilation System

Step 1 of 3

33%
  • General Details

  • 1. Company Information

  • 2. Mains voltage, frequency and phase at project location

  • Greenhouse structure data

  • The distance between the underside of the gutter and the upper side of the truss lattice
  • 10. Truss dimensions

  • 11. Post dimensions

    The post dimensions at the top of the post

  • 12. Ventilation window data

  • Ventilation pane size

  • 13. Ventilation pane size end bay

    possible small window(s) at the top end of the bay

  • 14. Ventilation window opening angle

  • Drop files here or
    Max. file size: 64 MB.